000 | 00913nam a2200181 a 4500 | ||
---|---|---|---|
005 | 20220228110652.0 | ||
035 | _aF8901000713299 | ||
084 | _aUC EERC 80-06 1980 | ||
100 | _aPowell, G.H. | ||
245 | _adesign of steel energy absorbing restrainers and their inco-rporation into nuclear power plants for enhanced safety. vo-l.1A: piping with energy-absorbing restrainers: parameter -study on small systems / by G.H. Powell, C. Oughourlian, Je-ffrey Simons | ||
260 | _aBerkeley, Calif. : University of California, College of Engineering | ||
300 | _a78 p. | ||
440 | _aReport ; No. UCB / EERC 80-06 | ||
500 | _a"Prepared for the Department of Energy under contract DE-AM-O3-76 SF 00034". | ||
690 | _aPlantas de poder nuclear - Entubaciones - Pruebas | ||
700 | _aOughourlian, C., coaut.Simons, Jeffrey, coaut. | ||
710 | _aUniversity of California, Berkeley. Earthquake Engineering -Research Center | ||
999 |
_c60780 _d60780 |